81 |
Truong Ba Huy, M.E. Cholette, P. Borghesani, L. Ma: A quantitative study on the impact of opportunistic maintenance in the presence of time-varying costs.. In proceedings of 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM). ISBN 978-1-5090-3665-3. IEEE (December 2016).
[Pub ID : #4040]
|
82 |
Phan Van Tong: Application optimize production process for car industry. In proceedings of APIEMS 2016. ISBN 978-604-73-3787-3. (December 2016).
[Pub ID : #3168]
|
83 |
Nguyen Van Chung: Ergonomics Application to Work Design on Seafood Processing Line. In proceedings of The 17th Asia Pacific Industrial Engineering And Management Systems Conference. (December 2016).
[Pub ID : #3100]
|
84 |
Nguyen Hoang Son, Ho Thanh Phong: Scheduling Quay Crane and Yard Equipment A case study of terminal in Central region. In proceedings of The 17th Asia Pacific Industrial Engineering And Management Systems Conference. (December 2016).
[Pub ID : #3098]
|
85 |
Nguyen Truong Nguyen, Tu Thien Dat, Ho Thanh Phong, Ho Doan Quoc: Simulation Application In Healthcare: A Case Study Of Outpatient Clinic In An Hospital, Hochiminh City. In proceedings of The 17th Asia Pacific Industrial Engineering And Management Systems Conference. (December 2016).
[Pub ID : #3097]
|
86 |
Huynh Gia Bao Ngoc, Ho Thanh Phong: Multimodal Transportation Optimization For An Automobile Production in Vietnam. In proceedings of The 17th Asia Pacific Industrial Engineering And Management Systems Conference. (December 2016).
[Pub ID : #3096]
|
87 |
Ngo Nguyen Minh Chau, Ho Thanh Phong: Supply chain for Vietnamese agricultural products: A case study of Japanese sweet potatoes in Binh Tan district-Vinh Long province. In proceedings of The 17th Asia Pacific Industrial Engineering And Management Systems Conference. (December 2016).
[Pub ID : #3095]
|
88 |
Nguyen Thanh Phong, Ho Thanh Phong: BUS REALLOCATION PROBLEM IN NETWORKS WITH OVERLAPPING ROUTES.. In proceedings of The 17th Asia Pacific Industrial Engineering And Management Systems Conference. (December 2016).
[Pub ID : #3094]
|
89 |
Nguyen Hoang Son, Ho Thanh Phong: Scheduling Quay Crane and Yard Equipment A case study of terminal in Central region. In proceedings of The 17th Asia Pacific Industrial Engineering And Management Systems Conference. (December 2016).
[Pub ID : #3093]
|
90 |
Le Huu Huy, Ho Thanh Phong, Ho Doan Quoc: Optimization Resource-Constrained Project Scheduling Problem with Stochastic Activity Durations. In proceedings of The 17th Asia Pacific Industrial Engineering And Management Systems Conference. (December 2016).
[Pub ID : #3092]
|